Peach Processing Plant Wastewater Treatment Case Study

Industrial Wastewater Treatment Peach Processing Plant Chopper PumpA major fresh pack operation of peaches and nectarines needed a screening system to remove the labels and peach fuzz from their wash water before it was pumped from the pond for irrigation use.  Flow to the pond is a steady flow of 50 gpm, rising to 600 gpm during periodic draining of the peach coolers and washing systems. The water is a combination of wash water, labels and fuzz from the fruit, which clogged the irrigation pump intake, left dried fuzz in the fields which is a skin irritant to the field staff.

Wastewater Treatment Peach Processing Plant Parabolic Screen and ConveyorIntegrated Engineers proposed a design to change the drains to the pond and rerouting them into an equalization catch basin, from which a Vaughan submersible chopper pump would pump it to a parabolic screening system. A polymer mixing and dispensing system would thicken the peach fuzz, which would then be filtered out by a parabolic screen. Filtered water would drain by gravity back to the pond for irrigation use, while solids would be conveyed to a dewatering bin for disposal.

Wastewater Treatment Peach Processing Plant Control PanelThe system is meeting the design goals by screening out 90+% of the labels and 70+% of the fuzz, at a total capital cost of about $110,000. Ongoing chemical costs are minimized by employment of an inexpensive polymer solution.  Integrated Engineers custom made the screen, polymer system, control panel with VFD’s for operator fine adjustment and tuning.

For more food processing industry case studies download here>>>

Or get started right away>>>Get Started

Integrated Engineers Inc Logo

Learn How to $$Save$$